Frodeåsen Tunnel

The Frodeåsen Tunnel (Norwegian: Frodeåstunnelen) is a 1,910-meter (6,270 ft) long twin-tube, four lane road tunnel in Tønsberg, Norway. Part of County Road 300, it runs through Frodeåsen between Kjelle and Velle north of the city center. Built as part of the , construction started on 28 October 2004 and the breakthrough was made on 9 March 2006. The tunnel and the new County Road 300 opened on 13 March 2008, creating a bypass road north of the town of Tønsberg.

Frodeåsen Tunnel

The Frodeåsen Tunnel (Norwegian: Frodeåstunnelen) is a 1,910-meter (6,270 ft) long twin-tube, four lane road tunnel in Tønsberg, Norway. Part of County Road 300, it runs through Frodeåsen between Kjelle and Velle north of the city center. Built as part of the , construction started on 28 October 2004 and the breakthrough was made on 9 March 2006. The tunnel and the new County Road 300 opened on 13 March 2008, creating a bypass road north of the town of Tønsberg.