Flint North
GM Powertrain Flint North (GMPT Flint North) was a General Motors automobile engine and components plant located at the Stewart Avenue exit of I-475 in Flint, Michigan . The plant consisted of several factories that combine to make the Flint North Powertrain plant. The 4,000,000-square-foot (370,000 m2) plant opened in 1905 as part of the Buick Motor Company, and was the last part of Buick City standing. The engine plant (Factory 36) portion of Powertrain Flint North closed in 2008. It is famous for building the GM 3800 engine, one of the longest-produced automobile engines in history. The remaining factories (05, 9, 10, 14, 25, 29, 75 and 81) which compose the maintenance, sanitation and components producing buildings of the plant, closed permanently on December 6, 2010. The employees of
primaryTopic
Flint North
GM Powertrain Flint North (GMPT Flint North) was a General Motors automobile engine and components plant located at the Stewart Avenue exit of I-475 in Flint, Michigan . The plant consisted of several factories that combine to make the Flint North Powertrain plant. The 4,000,000-square-foot (370,000 m2) plant opened in 1905 as part of the Buick Motor Company, and was the last part of Buick City standing. The engine plant (Factory 36) portion of Powertrain Flint North closed in 2008. It is famous for building the GM 3800 engine, one of the longest-produced automobile engines in history. The remaining factories (05, 9, 10, 14, 25, 29, 75 and 81) which compose the maintenance, sanitation and components producing buildings of the plant, closed permanently on December 6, 2010. The employees of
has abstract
GM Powertrain Flint North (GMP ...... represented by UAW Local 599.
@en
Wikipage page ID
Wikipage revision ID
566,873,034
subject
hypernym
point
43.056447222222225 -83.68090833333333
comment
GM Powertrain Flint North (GMP ...... ber 6, 2010. The employees of
@en
label
Flint North
@en
lat
4.3056447222e+1
long
-8.3680908333e+1