Amaranth Wind Farm
The Amaranth Wind Farm, also known as the Melancthon EcoPower Centre, is a 199.5 megawatt (MW) wind farm in Amaranth and Melancthon Township, near Shelburne, Ontario. The centre, Canada's largest wind energy installation, is owned and operated by TransAlta. Construction of the Melancthon EcoPower Centre began with the 67.5 MW Phase I in 2005 and achieved commercial operation in March 2006. Construction of the 132 MW Phase II of the project began in 2007 and achieved full commercial operation in November 2008.
Wikipage redirect
primaryTopic
Amaranth Wind Farm
The Amaranth Wind Farm, also known as the Melancthon EcoPower Centre, is a 199.5 megawatt (MW) wind farm in Amaranth and Melancthon Township, near Shelburne, Ontario. The centre, Canada's largest wind energy installation, is owned and operated by TransAlta. Construction of the Melancthon EcoPower Centre began with the 67.5 MW Phase I in 2005 and achieved commercial operation in March 2006. Construction of the 132 MW Phase II of the project began in 2007 and achieved full commercial operation in November 2008.
has abstract
The Amaranth Wind Farm, also k ...... al operation in November 2008.
@en
building start date
building start year
country
installed capacity (W)
opening date
2006-03-04
opening year
status
Operational
thumbnail
Link from a Wikipage to an external page
Wikipage page ID
20.234.433
Wikipage revision ID
727.557.601
coordinates display
coordinates type
image caption
Wind farm in Melancthon
lat d
4,41001e+1
location map
location map caption
Amaranth Wind Farm
long d
-8,02709e+1
point
44.1001 -80.2709
comment
The Amaranth Wind Farm, also k ...... al operation in November 2008.
@en
label
Amaranth Wind Farm
@en
lat
4,41001e+1
long
-8,02709e+1
wasDerivedFrom
isPrimaryTopicOf
name
Amaranth Wind Farm
@en