Cubic FasTIS

Cubic FasTIS ("Flexible and Secure Ticket Issuing System") is the latest TIS introduced to the UK National Rail Retailers. The prototype was piloted at Chiltern Railways High Wycombe station from April 2005, the second pilot machine was deployed at Banbury station. Following successful piloting, both Northern Rail and Chiltern Railways selected FasTIS to replace their APTIS fleet. Notably, the prototype at High Wycombe was destroyed when the station burnt down on Sunday 27 November 2005. Cubic FasTIS is now being replaced by Cubic FTO machine - 64bit and PCI-DSS secure

Cubic FasTIS

Cubic FasTIS ("Flexible and Secure Ticket Issuing System") is the latest TIS introduced to the UK National Rail Retailers. The prototype was piloted at Chiltern Railways High Wycombe station from April 2005, the second pilot machine was deployed at Banbury station. Following successful piloting, both Northern Rail and Chiltern Railways selected FasTIS to replace their APTIS fleet. Notably, the prototype at High Wycombe was destroyed when the station burnt down on Sunday 27 November 2005. Cubic FasTIS is now being replaced by Cubic FTO machine - 64bit and PCI-DSS secure