Madison Avenue Line (MATA Trolley)

The Madison Avenue Line is a line of the Memphis Area Transit Authority trolley system. The trolley line began operating in 2004, and cost $56 million to build. Currently, it operates 2.2 mi (3.5 km) of double track along Madison Avenue with six stops stretching into Midtown Memphis. The line was built to connect the Main Street system to the Medical District just east of Downtown Memphis, though there are currently no connecting routes between the two lines. The line is the first stage of a master plan to build a light rail link to the Memphis International Airport.

Madison Avenue Line (MATA Trolley)

The Madison Avenue Line is a line of the Memphis Area Transit Authority trolley system. The trolley line began operating in 2004, and cost $56 million to build. Currently, it operates 2.2 mi (3.5 km) of double track along Madison Avenue with six stops stretching into Midtown Memphis. The line was built to connect the Main Street system to the Medical District just east of Downtown Memphis, though there are currently no connecting routes between the two lines. The line is the first stage of a master plan to build a light rail link to the Memphis International Airport.