New Measurement Train
The New Measurement Train (NMT), is a specialised train which operates in the United Kingdom to assess the condition of track so that engineers can determine where to work. It is a specially converted High Speed Train, consisting of two Class 43 power cars and five Mark 3 carriages. It can check the condition of most main lines and some secondary routes operating a 13-week rolling cycle. The train is permitted to travel across any part of the network where HSTs are permitted, as well as High Speed 1.
Wikipage disambiguates
Wikipage redirect
primaryTopic
New Measurement Train
The New Measurement Train (NMT), is a specialised train which operates in the United Kingdom to assess the condition of track so that engineers can determine where to work. It is a specially converted High Speed Train, consisting of two Class 43 power cars and five Mark 3 carriages. It can check the condition of most main lines and some secondary routes operating a 13-week rolling cycle. The train is permitted to travel across any part of the network where HSTs are permitted, as well as High Speed 1.
has abstract
The New Measurement Train (NMT ...... tted, as well as High Speed 1.
@en
ネットワークレイル総合検測車 (New Measuremen ...... 出力をオペレータ12人のチームで観測できるようになっている。
@ja
manufacturer
number built
operator
Wikipage page ID
Wikipage revision ID
742,449,688
background
#012545;color:white
Caption
family
imagesize
service
subject
hypernym
comment
The New Measurement Train (NMT ...... tted, as well as High Speed 1.
@en
ネットワークレイル総合検測車 (New Measuremen ...... 3062 の三輌があり、43013 は緩衝器を装備している。
@ja
label
New Measurement Train
@en
ネットワークレイル総合検測車
@ja
wasDerivedFrom
isPrimaryTopicOf
name
New Measurement Train
@en