Newlincs EfW facility
The Newlincs EfW facility is an incinerator which is located in Grimsby, North East Lincolnshire, England. The plant is operated by Cyclerval UK & TIRU Group under a PFI contract. The engineering of the facility is unusual as it consists of an oscillating kiln handling 56,000 tonnes of waste per year/7 tonnes per hour of waste. The facility is capable of generating 3.2 MW electricity.
primaryTopic
Newlincs EfW facility
The Newlincs EfW facility is an incinerator which is located in Grimsby, North East Lincolnshire, England. The plant is operated by Cyclerval UK & TIRU Group under a PFI contract. The engineering of the facility is unusual as it consists of an oscillating kiln handling 56,000 tonnes of waste per year/7 tonnes per hour of waste. The facility is capable of generating 3.2 MW electricity.
has abstract
The Newlincs EfW facility is a ...... generating 3.2 MW electricity.
@en
country
opening year
operator
thumbnail
Link from a Wikipage to an external page
Wikipage page ID
Wikipage revision ID
653,056,780
image caption
NewLincs EfW facility in 2008
lat d
5.36063e+1
location map
long d
name official
NewLincs EfW facility
th fuel primary
hypernym
point
53.6063 -0.1439
comment
The Newlincs EfW facility is a ...... generating 3.2 MW electricity.
@en
label
Newlincs EfW facility
@en
lat
5.36063e+1
long
wasDerivedFrom
depiction
isPrimaryTopicOf
name
Newlincs EfW facility
@en