North Bank tunnel
The North Bank tunnel concept was a hydroelectric scheme being developed by Meridian Energy on the Waitaki River in Canterbury, New Zealand. The $993 million project was expected to produce an additional 1,100 to 1,400 gigawatt-hours (4,000 to 5,000 TJ) per annum, and take up to 260 cubic metres per second (9,200 cu ft/s) of water from Lake Waitaki. The project would have resulted in a 275 gigawatt-hours (990 TJ) per annum reduction in output from the Waitaki hydro station. This project is at a similar location to Project Aqua, a hydroelectric power proposal abandoned by Meridian in 2004.
Wikipage disambiguates
primaryTopic
North Bank tunnel
The North Bank tunnel concept was a hydroelectric scheme being developed by Meridian Energy on the Waitaki River in Canterbury, New Zealand. The $993 million project was expected to produce an additional 1,100 to 1,400 gigawatt-hours (4,000 to 5,000 TJ) per annum, and take up to 260 cubic metres per second (9,200 cu ft/s) of water from Lake Waitaki. The project would have resulted in a 275 gigawatt-hours (990 TJ) per annum reduction in output from the Waitaki hydro station. This project is at a similar location to Project Aqua, a hydroelectric power proposal abandoned by Meridian in 2004.
has abstract
The North Bank tunnel concept ...... abandoned by Meridian in 2004.
@en
installed capacity (W)
location
owner
status
Wikipage page ID
20,821,324
Wikipage revision ID
738,969,757
th fuel primary
subject
hypernym
comment
The North Bank tunnel concept ...... abandoned by Meridian in 2004.
@en
label
North Bank tunnel
@en
wasDerivedFrom
isPrimaryTopicOf
name
North Bank tunnel project
@en