14th Street Tunnel shutdown
The 14th Street Tunnel shutdown (also referred to as the L Project, the L train shutdown, or the Canarsie Tunnel reconstruction) was the partial closure and reconstruction of the New York City Subway's 14th Street Tunnel that took place from April 2019 to April 2020. The tunnel carries the BMT Canarsie Line (serving the L train) under the East River in New York City, connecting the boroughs of Brooklyn and Manhattan, and is used by an average of 225,000 passengers per weekday. A key segment of the 14th Street Tunnel, between the Bedford Avenue station in Brooklyn and the First Avenue station in Manhattan, would be partially closed for 15 to 20 months to allow for necessary and extensive repairs to the underwater tubes after it was flooded and severely damaged during Hurricane Sandy in 2012
14th Street Tunnel closure14th Street tunnel shutdown2019 L train shutdownBMT Canarsie Line closureBMT Canarsie Line shutdownCanarsie Line shutdownCanarsie Tube closureCanarsie Tubes closureCanarsie Tunnel closureCanarsie Tunnel shutdownCanarsie tunnel shutdownL14 (New York City bus)L14 SBS (New York City bus)L1 (New York City bus)L1 SBS (New York City bus)L2 (New York City bus)L2 SBS (New York City bus)L3 (New York City bus)L3 SBS (New York City bus)L4 (New York City bus)L4 SBS (New York City bus)L ProjectL train closureL train shutdownL train tunnel closure
Wikipage redirect
14th Street Tunnel closure14th Street tunnel shutdown14th_Street–Union_Square_station2017 New York City transit crisis2019 L train shutdownAccessibility of the Metropolitan Transportation AuthorityBMT Canarsie LineBMT Canarsie Line closureBMT Canarsie Line shutdownBroadway_Junction_stationCanarsie Line shutdownCanarsie Tube closureCanarsie Tubes closureCanarsie Tunnel closureCanarsie Tunnel shutdownCanarsie tunnel shutdownCiti BikeCourt_Square–23rd_Street_stationG (New York City Subway service)History of the New York City SubwayIRT New Lots LineL1L14L14 (New York City bus)L14 SBS (New York City bus)L1 (New York City bus)L1 SBS (New York City bus)L2L2 (New York City bus)L2 SBS (New York City bus)L3L3 (New York City bus)L3 SBS (New York City bus)L4
Link from a Wikipage to another Wikipage
primaryTopic
14th Street Tunnel shutdown
The 14th Street Tunnel shutdown (also referred to as the L Project, the L train shutdown, or the Canarsie Tunnel reconstruction) was the partial closure and reconstruction of the New York City Subway's 14th Street Tunnel that took place from April 2019 to April 2020. The tunnel carries the BMT Canarsie Line (serving the L train) under the East River in New York City, connecting the boroughs of Brooklyn and Manhattan, and is used by an average of 225,000 passengers per weekday. A key segment of the 14th Street Tunnel, between the Bedford Avenue station in Brooklyn and the First Avenue station in Manhattan, would be partially closed for 15 to 20 months to allow for necessary and extensive repairs to the underwater tubes after it was flooded and severely damaged during Hurricane Sandy in 2012
has abstract
The 14th Street Tunnel shutdow ...... nd service was merely reduced.
@en
Link from a Wikipage to an external page
Wikipage page ID
57,786,818
page length (characters) of wiki page
Wikipage revision ID
1,018,910,588
Link from a Wikipage to another Wikipage
wikiPageUsesTemplate
subject
point
40.724 -73.967
type
comment
The 14th Street Tunnel shutdow ...... during Hurricane Sandy in 2012
@en
label
14th Street Tunnel shutdown
@en
sameAs
lat
long
-7.3967e+1