Aguçadoura Wave Farm
The Aguçadoura Wave Farm was a wave farm located 5 km (3 mi) offshore near Póvoa de Varzim north of Porto in Portugal. The farm was designed to use three Pelamis Wave Energy Converters to convert the motion of the ocean surface waves into electricity, totalling to 2.25 MW in total installed capacity. The farm was officially opened on 23 September 2008, by the Portuguese Minister of Economy. The wave farm was shut down two months after the official opening in November 2008.
Link from a Wikipage to another Wikipage
primaryTopic
Aguçadoura Wave Farm
The Aguçadoura Wave Farm was a wave farm located 5 km (3 mi) offshore near Póvoa de Varzim north of Porto in Portugal. The farm was designed to use three Pelamis Wave Energy Converters to convert the motion of the ocean surface waves into electricity, totalling to 2.25 MW in total installed capacity. The farm was officially opened on 23 September 2008, by the Portuguese Minister of Economy. The wave farm was shut down two months after the official opening in November 2008.
has abstract
El Okeanós (parque de ondas da ...... e conexión a la red eléctrica.
@es
La ferme à vagues d'Aguçadoura ...... n officielle en novembre 2008.
@fr
O Parque de Ondas da Aguçadour ...... ue até já têm mais capacidade.
@pt
The Aguçadoura Wave Farm was a ...... cial opening in November 2008.
@en
country
installed capacity (W)
location
opening date
2008-09-23
opening year
owner
Link from a Wikipage to an external page
Wikipage page ID
12,911,905
page length (characters) of wiki page
Wikipage revision ID
973,522,027
Link from a Wikipage to another Wikipage
commissioned
2008-09-23
country
decommissioned
November 2008
@en
image caption
Pelamis machine bursting through a wave.
@en
Location
name
Aguçadoura Wave Farm
@en
owner
ps electrical capacity
ps units manu model
ps units operational
status
D
@en
wave technology
SA
@en
wave water body
wikiPageUsesTemplate
subject
hypernym
point
41.4325 -8.8425
type
comment
El Okeanós (parque de ondas da ...... ficial en noviembre de 2008.
@es
La ferme à vagues d'Aguçadoura ...... n officielle en novembre 2008.
@fr
O Parque de Ondas da Aguçadour ...... uzida e sem custos adicionais.
@pt
The Aguçadoura Wave Farm was a ...... cial opening in November 2008.
@en
label
Aguçadoura Wave Farm
@en
Ferme à vagues d'Aguçadoura
@fr
Okeanós
@es
Parque de Ondas da Aguçadoura
@pt
sameAs
lat
4.14325e+1
long
-8.8425e+0
wasDerivedFrom
isPrimaryTopicOf
name
Aguçadoura Wave Farm
@en