Bandar Utama–Klang line
The 37-kilometer LRT Shah Alam Line, previously known as the LRT Bandar Utama-Klang Line as well as Johan Setia Line, is a light rapid transit (LRT) line that is slated to be the third LRT system in the Klang Valley. The line will be operated by Rapid Rail. It was announced by Prasarana Malaysia on 24 April 2013. When completed, the line will be one of the components of the Klang Valley Integrated Transit System. It is numbered 11 and coloured Sky Blue on official rail maps.
Bandar Baru Klang
Bandar Bukit Tinggi
Bandar Utama
Bandar Utama MRT station
Glenmarie LRT station
I-City
Klang Parade
2016 in Malaysia2024 in rail transportBRT Federal LineBU11 LRT stationBandar Anggerik LRT stationBandar Botanik LRT stationBandar Bukti Tinggi LRT stationBandar Utama-Klang LineBandar Utama-Klang Line lineBandar Utama-Klang lineBandar Utama–Klang LineBatu Nilam LRT stationCommunications-based train controlDataran Prima LRT stationHisamuddin of SelangorJalan Meru LRT stationJohan Setia LRT stationKajang lineKayu Ara LRT stationKelana Indah LRT stationKlang_(city)Klang ValleyLRT3LRT Bandar Utama-Klang LineLine 11List of automated train systemsList of rail transit stations in the Klang Valley areaList of railway electrification systemsMalawati LRT stationMalaysian National ProjectsPersiaran Hishamuddin LRT StationPersiaran Hishamuddin LRT stationPersiaran Hishamuddin station
Link from a Wikipage to another Wikipage
primaryTopic
Bandar Utama–Klang line
The 37-kilometer LRT Shah Alam Line, previously known as the LRT Bandar Utama-Klang Line as well as Johan Setia Line, is a light rapid transit (LRT) line that is slated to be the third LRT system in the Klang Valley. The line will be operated by Rapid Rail. It was announced by Prasarana Malaysia on 24 April 2013. When completed, the line will be one of the components of the Klang Valley Integrated Transit System. It is numbered 11 and coloured Sky Blue on official rail maps.
has abstract
The 37-kilometer LRT Shah Alam ...... ky Blue on official rail maps.
@en
line length (μ)
location
number of stations
operator
railway rolling stock
speed limit (kmh)
status
51.2% on Apr 30, 2021
Under construction
Link from a Wikipage to an external page
Wikipage page ID
46,918,758
page length (characters) of wiki page
Wikipage revision ID
1,021,143,778
Link from a Wikipage to another Wikipage
box width
caption
Construction works for the LRT line
@en
Character
Fully Elevated
@en
conductionsystem
depot
Johan Setia Depot, Klang
@en
electrification
Third rail, 750 VDC
@en
locale
logo width
map state
collapsed
@en
name
Johan Setia Line
@en
native name
LRT Laluan Johan Setia
@en
operator
planopen
2020-08-31
2021-02-28
2023-11-30
Former
@en
Phase 1
@en
Phase 2
@en
Revised
@en
stations
status
Under construction
@en
stock
CRRC Zhuzhou LRV
@en
Former
@en
Length:
@en
Revised
@en
Width: - narrow profile
@en
wikiPageUsesTemplate
subject
type
comment
The 37-kilometer LRT Shah Alam ...... ky Blue on official rail maps.
@en
label
Bandar Utama–Klang line
@en
sameAs
wasDerivedFrom
homepage
isPrimaryTopicOf
name
Johan Setia Line
@en