Boškov Most Hydro Power Plant
Boškov Most Hydro Power Plant, referred to as Boškov Most HPP, is a derivation plant planned to be built in Mala Reka valley, in the southernmost part of the Mavrovo National Park, in North Macedonia. It will have a total capacity of 71,5 MW. Construction is expected to last 4 years. The project raises several environmental concerns, including threats on the survival of the Balkan lynx.
Wikipage redirect
Link from a Wikipage to another Wikipage
primaryTopic
Boškov Most Hydro Power Plant
Boškov Most Hydro Power Plant, referred to as Boškov Most HPP, is a derivation plant planned to be built in Mala Reka valley, in the southernmost part of the Mavrovo National Park, in North Macedonia. It will have a total capacity of 71,5 MW. Construction is expected to last 4 years. The project raises several environmental concerns, including threats on the survival of the Balkan lynx.
has abstract
Boškov Most Hydro Power Plant, ...... e survival of the Balkan lynx.
@en
country
description
Rock-filledembankment dam
@en
vastest lake
operator
purpose
volume (μ³)
Link from a Wikipage to an external page
Wikipage page ID
20.013.272
page length (characters) of wiki page
Wikipage revision ID
1.000.157.017
Link from a Wikipage to another Wikipage
cost
country
dam crosses
Mala Reka river
@en
dam height foundation
46 m
@en
dam height thalweg
32 m
@en
dam type
Rock-filled embankment dam
@en
dam volume
Location
Near Debar, Mavrovo and Rostuša Municipality
@en
name
Boškov Most Hydro Power Plant
@en
operator
plant annual gen
plant capacity
plant turbines
plant type
Derivation
@en
purpose
Power
@en
res capacity active
res capacity total
res elevation
990 m
@en
res name
Tresonče reservoir
@en
status
P
@en
wikiPageUsesTemplate
subject
point
41.54972222222222 20.61722222222222
comment
Boškov Most Hydro Power Plant, ...... e survival of the Balkan lynx.
@en
label
Boškov Most Hydro Power Plant
@en
lat
4,154972222222222e+1
long
2,061722222222222e+1
wasDerivedFrom
isPrimaryTopicOf
name
Boškov Most Hydro Power Plant
@en