Groton Wind Power Project
Groton Wind Power Project a 48-megawatt wind farm, also known as Groton Wind Farm was constructed in 2012 in Groton, New Hampshire in the northeast United States. Owned by Iberdrola Renovables, it is the third major wind-power installation in the state of New Hampshire. Power is being sold to NSTAR under a power purchase agreement, and will go to the Boston area. Located on Tenney Mountain and Fletcher Mountain in Groton, in Grafton County, it has 24 Gamesa G87, 2.0 MW turbines wind turbines. Delivery of turbine components began on June 25, 2012, and continued through August.
Wikipage disambiguates
Wikipage redirect
Link from a Wikipage to another Wikipage
primaryTopic
Groton Wind Power Project
Groton Wind Power Project a 48-megawatt wind farm, also known as Groton Wind Farm was constructed in 2012 in Groton, New Hampshire in the northeast United States. Owned by Iberdrola Renovables, it is the third major wind-power installation in the state of New Hampshire. Power is being sold to NSTAR under a power purchase agreement, and will go to the Boston area. Located on Tenney Mountain and Fletcher Mountain in Groton, in Grafton County, it has 24 Gamesa G87, 2.0 MW turbines wind turbines. Delivery of turbine components began on June 25, 2012, and continued through August.
has abstract
Groton Wind Power Project a 48 ...... and continued through August.
@en
building start date
building start year
installed capacity (W)
location
opening year
owner
Link from a Wikipage to an external page
Wikipage page ID
37,931,919
page length (characters) of wiki page
Wikipage revision ID
933,924,530
Link from a Wikipage to another Wikipage
commissioned
December 2012
@en
construction began
cost
country
United States
@en
Location
name
Groton Wind
@en
owner
ps annual generation
ps electrical capacity
ps site area
ps units manu model
Gamesa: G87 2.0 MW
@en
ps units operational
status
O
@en
wikiPageUsesTemplate
wind farm type
Onshore
@en
subject
point
43.75 -71.8
comment
Groton Wind Power Project a 48 ...... and continued through August.
@en
label
Groton Wind Power Project
@en
lat
long
wasDerivedFrom
isPrimaryTopicOf
name
Groton Wind
@en