Harbor Bridge Project
The Harbor Bridge Project (or New Harbor Bridge) is an $802.9 million project to replace the existing through arch bridge that crosses the Corpus Christi Ship Channel which serves the Port of Corpus Christi with a modern cable-stayed bridge design. The route will connect with SH 286 (the Crosstown Expressway) at its southern terminus, and US 181 on the north. Groundbreaking on construction took place on August 8, 2016 and is on schedule to be completed by the spring of 2020.On October 15, 2019, it was announced that the Harbor Bridge would not be completed until 2023.
Wikipage redirect
Link from a Wikipage to another Wikipage
primaryTopic
Harbor Bridge Project
The Harbor Bridge Project (or New Harbor Bridge) is an $802.9 million project to replace the existing through arch bridge that crosses the Corpus Christi Ship Channel which serves the Port of Corpus Christi with a modern cable-stayed bridge design. The route will connect with SH 286 (the Crosstown Expressway) at its southern terminus, and US 181 on the north. Groundbreaking on construction took place on August 8, 2016 and is on schedule to be completed by the spring of 2020.On October 15, 2019, it was announced that the Harbor Bridge would not be completed until 2023.
has abstract
The Harbor Bridge Project (or ...... suspend the design activities.
@en
Wikipage page ID
52,243,493
page length (characters) of wiki page
Wikipage revision ID
994,650,544
Link from a Wikipage to another Wikipage
Builders
Flatiron/Dragados
@en
construction start
estimated cost
Location
planned finish
property name
Harbor Bridge Project
@en
status
Under construction
@en
type
cable-stayed bridge
@en
wikiPageUsesTemplate
comment
The Harbor Bridge Project (or ...... d not be completed until 2023.
@en
label
Harbor Bridge Project
@en