Hefei–Fuzhou high-speed railway

Hefei–Fuzhou high-speed railway (simplified Chinese: 合福高速铁路; traditional Chinese: 合福高速鐵路; pinyin: Héfú Gāosù Tiělù), is a dual-track, electrified, passenger-dedicated, high-speed rail line between Hefei and Fuzhou, the provincial capitals of Anhui and Fujian, respectively. It has a total length of 813 km (505 mi) and runs through Anhui, Jiangxi and Fujian province. Construction began on April 27, 2010 and the line was opened on 28 June 2015. The total cost of the line was about ¥109.8 billion. On this line, trains can reach top speeds of 300 kilometres per hour, reducing the travel time by rail from Hefei to Fuzhou from fourteen to four hours. The railway is part of the future Beijing–Taipei high-speed rail corridor.

Hefei–Fuzhou high-speed railway

Hefei–Fuzhou high-speed railway (simplified Chinese: 合福高速铁路; traditional Chinese: 合福高速鐵路; pinyin: Héfú Gāosù Tiělù), is a dual-track, electrified, passenger-dedicated, high-speed rail line between Hefei and Fuzhou, the provincial capitals of Anhui and Fujian, respectively. It has a total length of 813 km (505 mi) and runs through Anhui, Jiangxi and Fujian province. Construction began on April 27, 2010 and the line was opened on 28 June 2015. The total cost of the line was about ¥109.8 billion. On this line, trains can reach top speeds of 300 kilometres per hour, reducing the travel time by rail from Hefei to Fuzhou from fourteen to four hours. The railway is part of the future Beijing–Taipei high-speed rail corridor.