Ibrahimiya Canal

The Ibrahimiyah Canal is an irrigation canal in Egypt built in 1873. It was the most important public work executed under the then newly established Ministry of Public Works. It was built during the reign of Ismail Pasha when he was Khedive of Egypt. It was commissioned by Bahgat Pasha, minister of public works, who designed it primarily to provide perennial irrigation to the Khedivial sugar estates in Middle Egypt. It supplied perennial irrigation to 580,000 acres (2,300 km2) and flood irrigation to another 420,000 acres (1,700 km2). The discharge of the canal varied between 30 and 80 cubic metres per second in summer and between 500 and 900 cubic metres per second in flood. Having its head on the left bank of the Nile, in Assiut, it runs northwards for 60 kilometres and then divides in D

Ibrahimiya Canal

The Ibrahimiyah Canal is an irrigation canal in Egypt built in 1873. It was the most important public work executed under the then newly established Ministry of Public Works. It was built during the reign of Ismail Pasha when he was Khedive of Egypt. It was commissioned by Bahgat Pasha, minister of public works, who designed it primarily to provide perennial irrigation to the Khedivial sugar estates in Middle Egypt. It supplied perennial irrigation to 580,000 acres (2,300 km2) and flood irrigation to another 420,000 acres (1,700 km2). The discharge of the canal varied between 30 and 80 cubic metres per second in summer and between 500 and 900 cubic metres per second in flood. Having its head on the left bank of the Nile, in Assiut, it runs northwards for 60 kilometres and then divides in D