Line 1 (Changchun Subway)

Line 1 of the Changchun Subway (Chinese: 长春轨道交通1号线; pinyin: Chángchūn Guǐdào Jiāotōng Yī Hào Xiàn) is a rapid transit line running from north to south Changchun. It opened on 30 June 2017. This line is 18.14 km long with 15 stations.

Line 1 (Changchun Subway)

Line 1 of the Changchun Subway (Chinese: 长春轨道交通1号线; pinyin: Chángchūn Guǐdào Jiāotōng Yī Hào Xiàn) is a rapid transit line running from north to south Changchun. It opened on 30 June 2017. This line is 18.14 km long with 15 stations.