Line 2 (Changchun Subway)

Line 2 of the Changchun Subway (Chinese: 长春轨道交通2号线; pinyin: Chángchūn Guǐdào Jiāotōng Èr Hào Xiàn) is a rapid transit line running from west to east Changchun. It started operation on 30 August 2018. This line is 20.5 km long with 18 stations.

Line 2 (Changchun Subway)

Line 2 of the Changchun Subway (Chinese: 长春轨道交通2号线; pinyin: Chángchūn Guǐdào Jiāotōng Èr Hào Xiàn) is a rapid transit line running from west to east Changchun. It started operation on 30 August 2018. This line is 20.5 km long with 18 stations.