Line 3 (Mumbai Metro)
The Aqua Line 3 of the Mumbai Metro, also known as Colaba-Bandra-Seepz Line, is a part of the metro system under construction in Mumbai, India. When completed, the 33.5-km long line will be the first underground metro line in Mumbai and will be operated by MMRC. The metro line will connect Cuffe Parade business district in the extreme south of the city to SEEPZ in the north-central with 26 underground and one at-grade station. The track width is standard gauge. The cost of this corridor is estimated at ₹30,000 crore (US$4.2 billion). Line 3 is expected to reduce road congestion, besides reducing the load on the Western Line between Bandra and Churchgate.
Wikipage disambiguates
Wikipage redirect
Aarey ForestAirport rail linkAlstom MetropolisAshwini BhideChhatrapati_Shivaji_Maharaj_International_AirportLine 10 (Mumbai Metro)Line 11 (Mumbai Metro)Line_1_(Mumbai_Metro)Line 2 (Mumbai Metro)Line 3Line 6 (Mumbai Metro)Line 7 (Mumbai Metro)List of Mumbai Metro stationsList of automated train systemsList of longest subway tunnel sectionsMMRCLMumbai_MetroMumbai Metro Line 3Mumbai Metro Rail CorporationMumbai Metropolitan Region Development AuthorityMumbai–Ahmedabad high-speed rail corridorPlatform screen doorsRail India Technical and Economic ServiceWestern line (Mumbai Suburban Railway)
Link from a Wikipage to another Wikipage
primaryTopic
Line 3 (Mumbai Metro)
The Aqua Line 3 of the Mumbai Metro, also known as Colaba-Bandra-Seepz Line, is a part of the metro system under construction in Mumbai, India. When completed, the 33.5-km long line will be the first underground metro line in Mumbai and will be operated by MMRC. The metro line will connect Cuffe Parade business district in the extreme south of the city to SEEPZ in the north-central with 26 underground and one at-grade station. The track width is standard gauge. The cost of this corridor is estimated at ₹30,000 crore (US$4.2 billion). Line 3 is expected to reduce road congestion, besides reducing the load on the Western Line between Bandra and Churchgate.
has abstract
The Aqua Line 3 of the Mumbai ...... portance of the metro project.
@en
is part of
line length (μ)
location
number of stations
railway rolling stock
route end
route start
status
Under construction
type
Wikipage page ID
42,107,710
page length (characters) of wiki page
Wikipage revision ID
1,026,297,223
Link from a Wikipage to another Wikipage
caption
Alstom Rolling Stock
@en
Character
Underground and at grade
@en
daily ridership
depot
electrification
Overhead 25 kV AC
@en
end
linelength km
locale
map state
collapsed
@en
other name
Colaba–Bandra-SEEPZ line
@en
Metro 3
@en
owner
Mumbai Metro Rail Corporation Ltd
@en
planopen
July 2023
@en
start
stations
status
Under construction
@en
stock
system
type
wikiPageUsesTemplate
hypernym
type
comment
The Aqua Line 3 of the Mumbai ...... between Bandra and Churchgate.
@en
label
Line 3 (Mumbai Metro)
@en
sameAs
wasDerivedFrom
isPrimaryTopicOf
name
40px|link=Mumbai MetroMumbai Metro Aqua Line 3
@en