Network 2011

Network 2011 was a plan for transit expansion created in 1985 by the Toronto Transit Commission. It was centred on three proposed subway lines: the Downtown Relief Line, Eglinton West Line, and the Sheppard Line. Eventually only a portion of the Sheppard Line was built, while construction on the Eglinton line was started and then abandoned.

Network 2011

Network 2011 was a plan for transit expansion created in 1985 by the Toronto Transit Commission. It was centred on three proposed subway lines: the Downtown Relief Line, Eglinton West Line, and the Sheppard Line. Eventually only a portion of the Sheppard Line was built, while construction on the Eglinton line was started and then abandoned.