Network 2011
Network 2011 was a plan for transit expansion created in 1985 by the Toronto Transit Commission. It was centred on three proposed subway lines: the Downtown Relief Line, Eglinton West Line, and the Sheppard Line. Eventually only a portion of the Sheppard Line was built, while construction on the Eglinton line was started and then abandoned.
primaryTopic
Network 2011
Network 2011 was a plan for transit expansion created in 1985 by the Toronto Transit Commission. It was centred on three proposed subway lines: the Downtown Relief Line, Eglinton West Line, and the Sheppard Line. Eventually only a portion of the Sheppard Line was built, while construction on the Eglinton line was started and then abandoned.
has abstract
Network 2011 was a plan for tr ...... as started and then abandoned.
@en
Link from a Wikipage to an external page
Wikipage page ID
29,955,263
page length (characters) of wiki page
Wikipage revision ID
946,873,061
Link from a Wikipage to another Wikipage
wikiPageUsesTemplate
hypernym
type
comment
Network 2011 was a plan for tr ...... as started and then abandoned.
@en
label
Network 2011
@en