North–South Harbor Bridge

The North and South Harbor Bridge is an upcoming cable-stayed bridge that will connect Barangay 20 (Parola) in the North Harbor and Barangay 649 (Baseco Island) in the South Harbor of the Port of Manila. It will cross over Pasig River and is parallel to the M. Roxas Jr. Bridge (Delpan Bridge). Civil works are expected to begin in 2021 and the bridge is scheduled to be completed and operational by 2023.

North–South Harbor Bridge

The North and South Harbor Bridge is an upcoming cable-stayed bridge that will connect Barangay 20 (Parola) in the North Harbor and Barangay 649 (Baseco Island) in the South Harbor of the Port of Manila. It will cross over Pasig River and is parallel to the M. Roxas Jr. Bridge (Delpan Bridge). Civil works are expected to begin in 2021 and the bridge is scheduled to be completed and operational by 2023.