North–South Harbor Bridge
The North and South Harbor Bridge is an upcoming cable-stayed bridge that will connect Barangay 20 (Parola) in the North Harbor and Barangay 649 (Baseco Island) in the South Harbor of the Port of Manila. It will cross over Pasig River and is parallel to the M. Roxas Jr. Bridge (Delpan Bridge). Civil works are expected to begin in 2021 and the bridge is scheduled to be completed and operational by 2023.
Wikipage redirect
Link from a Wikipage to another Wikipage
primaryTopic
North–South Harbor Bridge
The North and South Harbor Bridge is an upcoming cable-stayed bridge that will connect Barangay 20 (Parola) in the North Harbor and Barangay 649 (Baseco Island) in the South Harbor of the Port of Manila. It will cross over Pasig River and is parallel to the M. Roxas Jr. Bridge (Delpan Bridge). Civil works are expected to begin in 2021 and the bridge is scheduled to be completed and operational by 2023.
length (km)
has abstract
The North and South Harbor Bri ...... leted and operational by 2023.
@en
bridge carries
Motor vehicles, pedestrians and bicycles
length (μ)
located in area
Wikipage page ID
64,733,865
page length (characters) of wiki page
Wikipage revision ID
976,767,471
Link from a Wikipage to another Wikipage
carries
Motor vehicles, pedestrians and bicycles
@en
locale
name
North–South Harbor Bridge
@en
number spans
wikiPageUsesTemplate
comment
The North and South Harbor Bri ...... leted and operational by 2023.
@en
label
North–South Harbor Bridge
@en