Redwood Solar Cluster
The Redwood Solar Cluster is a 100 MW photovoltaic power station that is located in Kern County, California. The final phase, named Redwood 4, was completed in March 2018, and is located 12 miles east of downtown Bakersfield. Redwood 4 is rated at 26 MW.
Link from a Wikipage to another Wikipage
primaryTopic
Redwood Solar Cluster
The Redwood Solar Cluster is a 100 MW photovoltaic power station that is located in Kern County, California. The final phase, named Redwood 4, was completed in March 2018, and is located 12 miles east of downtown Bakersfield. Redwood 4 is rated at 26 MW.
has abstract
The Redwood Solar Cluster is a ...... . Redwood 4 is rated at 26 MW.
@en
Wikipage page ID
59,888,215
page length (characters) of wiki page
Wikipage revision ID
944,591,974
Link from a Wikipage to another Wikipage
wikiPageUsesTemplate
point
35.3229 -118.8124
type
comment
The Redwood Solar Cluster is a ...... . Redwood 4 is rated at 26 MW.
@en
label
Redwood Solar Cluster
@en
sameAs
lat
3.53229e+1
long
-1.188124e+2