Regional Connector
The Regional Connector Transit Project is a 1.9 mi (3.1 km) light rail subway tunnel under construction in Downtown Los Angeles. It is designed to connect the existing Metro Rail A (Blue) and E (Expo) Lines at 7th Street/Metro Center station to the existing L (Gold) Line and Union Station. When completed, the project will provide a one-seat ride into the core of Downtown for passengers on those lines who currently need to transfer, and it will reduce or eliminate transfers for many passengers traveling across the region via Downtown.
APU/Citrus College station
Atlantic station (Los Angeles Metro)
Atomic Cafe (diner)
Broadway (Los Angeles)
Chinatown station (Los Angeles Metro)
Civic Center, Los Angeles
Grand Av Arts/Bunker Hill station
Historic Broadway station
Japanese American National Museum
Little Tokyo, Los Angeles
Little Tokyo/Arts District station
Los Angeles City Hall
Los Angeles Music Center
Maravilla station
1st Street, Los Angeles2022 in rail transport2028 Summer OlympicsA Line (Los Angeles Metro)Downtown Connector(Los Angeles)Downtown Connector (Los Angeles)Downtown_Los_AngelesE Line (Los Angeles Metro)Eastside Transit CorridorGlendora,_CaliforniaGold Line Foothill ExtensionHistory of rail transportation in CaliforniaK Line (Los Angeles Metro)LACMTA Regional ConnectorL Line (Los Angeles Metro)La_Verne,_CaliforniaList of Los Angeles Metro Rail stationsList of tallest buildings in Los AngelesList of transport megaprojectsList of tunnels in CaliforniaLoading gaugeLos Angeles MTA Regional ConnectorLos Angeles Metro RailLos Angeles bid for the 2024 Summer OlympicsLos Angeles streets, 1–10Palmdale,_California
Link from a Wikipage to another Wikipage
primaryTopic
Regional Connector
The Regional Connector Transit Project is a 1.9 mi (3.1 km) light rail subway tunnel under construction in Downtown Los Angeles. It is designed to connect the existing Metro Rail A (Blue) and E (Expo) Lines at 7th Street/Metro Center station to the existing L (Gold) Line and Union Station. When completed, the project will provide a one-seat ride into the core of Downtown for passengers on those lines who currently need to transfer, and it will reduce or eliminate transfers for many passengers traveling across the region via Downtown.
has abstract
The Regional Connector Transit ...... ecast to begin in August 2022.
@en
is part of
line length (μ)
3.0577536e+3
location
status
Under construction
type
Link from a Wikipage to an external page
Wikipage page ID
page length (characters) of wiki page
Wikipage revision ID
1,022,815,130
Link from a Wikipage to another Wikipage
caption
Map of the approved route of the Regional Connector
@en
Character
Subway
@en
image width
linelength mi
locale
name
@en
Regional Connector Transit Project
@en
status
Under construction
@en
system
type
wikiPageUsesTemplate
subject
hypernym
type
comment
The Regional Connector Transit ...... cross the region via Downtown.
@en
label
Regional Connector
@en
wasDerivedFrom
homepage
isPrimaryTopicOf
name
Regional Connector Transit Project
@en