Solarpark Alt Daber
The Solarpark Alt Daber is a photovoltaic facility in Germany with 67.8 megawatts (MW, 90,900 hp). It was completed 3 December 2011, for a cost of €100 million, and is expected to produce 71 GWh/year. It is located on a former military airport. In 2014 a prototype of a battery storage system was added, mainly to provide frequency-response.
Link from a Wikipage to another Wikipage
primaryTopic
Solarpark Alt Daber
The Solarpark Alt Daber is a photovoltaic facility in Germany with 67.8 megawatts (MW, 90,900 hp). It was completed 3 December 2011, for a cost of €100 million, and is expected to produce 71 GWh/year. It is located on a former military airport. In 2014 a prototype of a battery storage system was added, mainly to provide frequency-response.
has abstract
Der Solarpark Alt Daber ist ei ...... ung von Regelleistung ergänzt.
@de
La planta solar Alt Daber (en ...... la regulación de frecuencia.
@es
The Solarpark Alt Daber is a p ...... to provide frequency-response.
@en
average annual gross power generation (J)
2.5704e+14
country
installed capacity (W)
location
opening date
2011-12-03
opening year
Link from a Wikipage to an external page
Wikipage page ID
36,670,300
page length (characters) of wiki page
Wikipage revision ID
991,966,287
Link from a Wikipage to another Wikipage
commissioned
2011-12-03
cost
country
Germany
@en
Location
name
Solarpark Alt Daber
@en
ps annual generation
ps electrical capacity
ps units operational
solar type
PV
@en
status
O
@en
wikiPageUsesTemplate
hypernym
point
53.2 12.516666666666667
comment
Der Solarpark Alt Daber ist ei ...... ung von Regelleistung ergänzt.
@de
La planta solar Alt Daber (en ...... la regulación de frecuencia.
@es
The Solarpark Alt Daber is a p ...... to provide frequency-response.
@en
label
Planta Solar Alt Daber
@es
Solarpark Alt Daber
@de
Solarpark Alt Daber
@en
lat
long
1.2516666666666667e+1
wasDerivedFrom
isPrimaryTopicOf
name
Solarpark Alt Daber
@en