Tajik–Afghan bridge at Panji Poyon

The Tajikistan-Afghanistan bridge spanning the Panj River between Panji Poyon (or Nizhniy Pyandzh), Tajikistan and Sherkhan Bandar, Afghanistan was opened on 26 August 2007.The two lane bridge is 672 metres (2,205 feet) long and 11.6 metres (38 feet) wide. It cost approximately $40 million, financed by the US Army Corps of Engineers and was designed and constructed by an Italian company, Rizzani de Eccher S.p.A.The Tajik President Emomali Rahmon and Afghan President Hamid Karzai were joined by US Secretary of Commerce Carlos Gutierrez at the opening ceremony.

Tajik–Afghan bridge at Panji Poyon

The Tajikistan-Afghanistan bridge spanning the Panj River between Panji Poyon (or Nizhniy Pyandzh), Tajikistan and Sherkhan Bandar, Afghanistan was opened on 26 August 2007.The two lane bridge is 672 metres (2,205 feet) long and 11.6 metres (38 feet) wide. It cost approximately $40 million, financed by the US Army Corps of Engineers and was designed and constructed by an Italian company, Rizzani de Eccher S.p.A.The Tajik President Emomali Rahmon and Afghan President Hamid Karzai were joined by US Secretary of Commerce Carlos Gutierrez at the opening ceremony.