West Coast Highway, Singapore
West Coast Highway (Chinese: 西海岸大路; Malay: Lebuhraya Pantai Barat) is a major arterial road in Singapore which links Jurong industrial estate and Clementi New Town to the city. It is an at-grade road from its junction with Pandan Loop and West Coast Road to its interchange with Pasir Panjang Road, where it becomes a grade-separated viaduct; the viaduct merges with Keppel Road before its interchange with Ayer Rajah Expressway. The total length of the highway is 11 km. The viaduct is newer than the at-grade section, having been completed in 2006.
Wikipage disambiguates
Wikipage redirect
2006 in SingaporeCircle MRT lineClementi,_SingaporeExpressways of SingaporeIndex of Singapore-related articlesLimited-access roadList of bridges in SingaporeList of underpasses and tunnels in SingaporeMaritime Square (subzone)Nicoll HighwayOuter Ring Road SystemQueenstown, SingaporeRoad names in SingaporeWest Coast HighwayWest Coast Highway (Singapore)West Coast Highway (Singapore road)
Link from a Wikipage to another Wikipage
primaryTopic
West Coast Highway, Singapore
West Coast Highway (Chinese: 西海岸大路; Malay: Lebuhraya Pantai Barat) is a major arterial road in Singapore which links Jurong industrial estate and Clementi New Town to the city. It is an at-grade road from its junction with Pandan Loop and West Coast Road to its interchange with Pasir Panjang Road, where it becomes a grade-separated viaduct; the viaduct merges with Keppel Road before its interchange with Ayer Rajah Expressway. The total length of the highway is 11 km. The viaduct is newer than the at-grade section, having been completed in 2006.
has abstract
West Coast Highway (Chinese: 西 ...... t is the longest in Singapore.
@en
route end
road end direction
route start
road start direction
Link from a Wikipage to an external page
Wikipage page ID
page length (characters) of wiki page
Wikipage revision ID
997,340,716
Link from a Wikipage to another Wikipage
bot
InternetArchiveBot
@en
country
SGP
@en
date
June 2020
@en
direction a
West
@en
direction b
East
@en
fix-attempted
yes
@en
history
At-grade road widened in 2000
@en
Viaduct opened in 2006
@en
map notes
West Coast Highway is labelled in double yellow line
@en
name
West Coast Highway
@en
terminus a
terminus b
Tanjong Pagar
@en
wikiPageUsesTemplate
hypernym
comment
West Coast Highway (Chinese: 西 ...... having been completed in 2006.
@en
label
West Coast Highway, Singapore
@en
wasDerivedFrom
isPrimaryTopicOf
name
West Coast Highway
@en