Yabog pipeline
The Yabog (Yacimientos-Bolivian Gulf) pipeline is a natural gas pipeline. It is 441 kilometres (274 mi) long and connects Río Grande in Santa Cruz de la Sierra, Bolivia, with Campo Duran in Salta Province, Argentina. The pipeline was commissioned in 1972.
Wikipage redirect
primaryTopic
Yabog pipeline
The Yabog (Yacimientos-Bolivian Gulf) pipeline is a natural gas pipeline. It is 441 kilometres (274 mi) long and connects Río Grande in Santa Cruz de la Sierra, Bolivia, with Campo Duran in Salta Province, Argentina. The pipeline was commissioned in 1972.
has abstract
The Yabog (Yacimientos-Bolivia ...... line was commissioned in 1972.
@en
Yabog (Yacimientos-Bolivian Gu ...... системи Болівії та Аргентини.
@uk
Wikipage page ID
11,191,258
page length (characters) of wiki page
Wikipage revision ID
1,002,294,317
Link from a Wikipage to another Wikipage
discharge
6,200,000,000
finish
Campo Duran in Salta Province, Argentina
@en
length km
map caption
Location of Yabog pipeline
@en
name
Yabog pipeline
@en
operator
Transredes, Transportadora de Gas del Norte
@en
partners
YPFB, TecGas NV, Compañía General de Combustibles S.A., Total S.A., Petronas
@en
start
Río Grande in Santa Cruz de la Sierra, Bolivia
@en
type
natural gas
@en
wikiPageUsesTemplate
subject
comment
The Yabog (Yacimientos-Bolivia ...... line was commissioned in 1972.
@en
Yabog (Yacimientos-Bolivian Gu ...... системи Болівії та Аргентини.
@uk
label
Yabog pipeline
@en
Yabog
@uk