AirportLink (Miami)

AirportLink is an extended segment of the Miami Metrorail transit system that expanded the system from the existing Earlington Heights Station to the Miami Central Station, which was completed in 2012. The Orange line has 16 stations from Kendall through Downtown Miami as well as a direct connection to Miami International Airport at Central Station via the free MIA Mover airport people mover.

AirportLink (Miami)

AirportLink is an extended segment of the Miami Metrorail transit system that expanded the system from the existing Earlington Heights Station to the Miami Central Station, which was completed in 2012. The Orange line has 16 stations from Kendall through Downtown Miami as well as a direct connection to Miami International Airport at Central Station via the free MIA Mover airport people mover.