Barbara and Jack Davis Hall
Officially opened in May 10, 2012, as a part of University at Buffalo's 2020 Strategic Plan, construction of Barbara and Jack Davis Hall, known as Davis Hall, started in 2009 with ground-breaking and finished in late 2011 with a construction cost of $75m including nearly $49.6m from New York State funding and the rest from corporate and individual endowments. Besides UB Engineering, Davis Hall is the new host to both Computer Science and Electrical Engineering departments featuring several new laboratories and research centers.
Wikipage disambiguates
Wikipage redirect
primaryTopic
Barbara and Jack Davis Hall
Officially opened in May 10, 2012, as a part of University at Buffalo's 2020 Strategic Plan, construction of Barbara and Jack Davis Hall, known as Davis Hall, started in 2009 with ground-breaking and finished in late 2011 with a construction cost of $75m including nearly $49.6m from New York State funding and the rest from corporate and individual endowments. Besides UB Engineering, Davis Hall is the new host to both Computer Science and Electrical Engineering departments featuring several new laboratories and research centers.
floor area (m2)
12077.3952
has abstract
Officially opened in May 10, 2 ...... 's Gold certificate standards.
@en
building end date
cost ($)
floor area (m2)
1.20773952e+4
floor count
tenant
Link from a Wikipage to an external page
Wikipage page ID
39,543,221
Wikipage revision ID
738,307,087
architect
Robert Goodwin
architecture firm
coordinates display
groundbreaking date
Latitude
4.3002795e+1
Longitude
-7.8787145e+1
main contractor
opened date
2012-05-10
subject
comment
Officially opened in May 10, 2 ...... ratories and research centers.
@en
label
Barbara and Jack Davis Hall
@en
wasDerivedFrom
isPrimaryTopicOf
name
Barbara and Jack Davis Hall
@en