GWR 4900 Class 5967 Bickmarsh Hall

The GWR 4900 Class locomotive No. 5967 Bickmarsh Hall was built at Swindon railway works, and was completed in March 1937. First allocated to Chester, in August 1950 it was allocated to Banbury, and then in March 1959 to Newton Abbott. Fitted with a boiler from a Modified Hall with 3 row superheater during its last overhaul at Swindon in 1961, it was then given its last allocation to Westbury.

GWR 4900 Class 5967 Bickmarsh Hall

The GWR 4900 Class locomotive No. 5967 Bickmarsh Hall was built at Swindon railway works, and was completed in March 1937. First allocated to Chester, in August 1950 it was allocated to Banbury, and then in March 1959 to Newton Abbott. Fitted with a boiler from a Modified Hall with 3 row superheater during its last overhaul at Swindon in 1961, it was then given its last allocation to Westbury.