Hurricane Canal

The Hurricane Canal is a hand-excavated irrigation canal that diverted water from the Virgin River to the vicinity of Hurricane, Utah. The 7.5-mile (12.1 km) canal was built starting in 1891 and completed in 1904. The work included a diversion dam on the Virgin River, the 12-foot (3.7 m) wide canal grade with an 8-foot (2.4 m) wide by 4-foot (1.2 m) deep channel, and a series of flumes and trestles. Work was done by local men, mainly between November and May. The work was paid for by the canal's shareholders, whose lands on the Hurricane Bench were to be irrigated by the canal. Allotments were limited to 20 acres (8.1 ha) for shareholder. The 2,000 acres (810 ha) of new agricultural lands allowed the settlement of Hurricane after 1906.

Hurricane Canal

The Hurricane Canal is a hand-excavated irrigation canal that diverted water from the Virgin River to the vicinity of Hurricane, Utah. The 7.5-mile (12.1 km) canal was built starting in 1891 and completed in 1904. The work included a diversion dam on the Virgin River, the 12-foot (3.7 m) wide canal grade with an 8-foot (2.4 m) wide by 4-foot (1.2 m) deep channel, and a series of flumes and trestles. Work was done by local men, mainly between November and May. The work was paid for by the canal's shareholders, whose lands on the Hurricane Bench were to be irrigated by the canal. Allotments were limited to 20 acres (8.1 ha) for shareholder. The 2,000 acres (810 ha) of new agricultural lands allowed the settlement of Hurricane after 1906.