KL Monorail

The KL Monorail Line is an urban monorail system in Kuala Lumpur, Malaysia. It opened on 31 August 2003, with 11 stations running 8.6 km (5 mi) on two parallel elevated tracks. It connects the Kuala Lumpur Sentral transport hub with the "Golden Triangle". It was completed at a cost of MYR 1.18 billion by the KL Infrastructure Group (KL Infra). The line is one of the components of the Klang Valley Integrated Transit System.

KL Monorail

The KL Monorail Line is an urban monorail system in Kuala Lumpur, Malaysia. It opened on 31 August 2003, with 11 stations running 8.6 km (5 mi) on two parallel elevated tracks. It connects the Kuala Lumpur Sentral transport hub with the "Golden Triangle". It was completed at a cost of MYR 1.18 billion by the KL Infrastructure Group (KL Infra). The line is one of the components of the Klang Valley Integrated Transit System.