Stadler NExT
The Niederflur-Express-Triebzug (NExT, English: low-floor express trainset) is an electric multiple unit light commuter train developed by Stadler Rail for the Swiss Regionalverkehr Bern-Solothurn (RBS) railway. With a top speed of 120 km/h, it is the fastest metre gauge train in Switzerland. Six three-carriage trains were delivered in 2009 at a cost of 53.4 million CHF and are used for express service between Berne and Solothurn. In 2013, 6 additional trains were delivered.
Stadler NExT
The Niederflur-Express-Triebzug (NExT, English: low-floor express trainset) is an electric multiple unit light commuter train developed by Stadler Rail for the Swiss Regionalverkehr Bern-Solothurn (RBS) railway. With a top speed of 120 km/h, it is the fastest metre gauge train in Switzerland. Six three-carriage trains were delivered in 2009 at a cost of 53.4 million CHF and are used for express service between Berne and Solothurn. In 2013, 6 additional trains were delivered.
weight (kg)
has abstract
De RABe 4/12 van het Stadler ...... lverkehr Bern-Solothurn (RBS).
@nl
The Niederflur-Express-Triebzu ...... muter transport with the NExT.
@en
スイスの首都ベルン付近に56.5kmの路線を持ち、Sバーンの ...... -Triebzug、低床式急行電車)の名称がつけられている。
@ja
capacity
number built
weight (g)
Link from a Wikipage to an external page
Wikipage page ID
23,119,109
Wikipage revision ID
743,456,353
year of construction
acceleration
art-sections
Caption
Stadler NExT at Jegenstorf
carbody
electricsystem
factory
fleetnumbers
formation
numberservice
poweroutput
service
comment
De RABe 4/12 van het Stadler ...... lverkehr Bern-Solothurn (RBS).
@nl
The Niederflur-Express-Triebzu ...... itional trains were delivered.
@en
スイスの首都ベルン付近に56.5kmの路線を持ち、Sバーンの ...... -Triebzug、低床式急行電車)の名称がつけられている。
@ja
label
RBS RABe 4/12
@nl
Stadler NExT
@en
ベルン-ソロトゥルン地域交通RABe4/12 21-26形電車
@ja
wasDerivedFrom
isPrimaryTopicOf
name
NExT
@en