USS Cyclone
USS Cyclone (PC-1) was the first of the Navy's Cyclone class coastal patrol ships. As the lead ship of her class, Cyclone served as the test bed for this series of 14 vessels. She was laid down at Bollinger Shipyards, in Lockport, Louisiana, on 22 June 1990, launched on 1 February 1992, and commissioned on 7 August 1993.
Wikipage redirect
primaryTopic
USS Cyclone
USS Cyclone (PC-1) was the first of the Navy's Cyclone class coastal patrol ships. As the lead ship of her class, Cyclone served as the test bed for this series of 14 vessels. She was laid down at Bollinger Shipyards, in Lockport, Louisiana, on 22 June 1990, launched on 1 February 1992, and commissioned on 7 August 1993.
length (mm)
has abstract
USS Cyclone (PC-1) was the fir ...... commissioned on 7 August 1993.
@en
date of acquirement
2000-02-29
2004-03-08
builder
commissioning date
1993-08-07
2000-02-29
cost ($)
country
decommissioning date
2000-02-28
laying down
1991-06-22
length (μ)
order date
1990-08-01
ship beam (μ)
ship launched
1992-02-01
status
Active-in Service
Transferred on 29 February 2000 to theUnited States Coast Guard.
Transferred to thePhilippinesNavy.
thumbnail
top speed (kmh)
Link from a Wikipage to an external page
Wikipage page ID
Wikipage revision ID
727,372,056
Hide header
Ship armament
* 1 × Mk96 25 mm cannon/40mm g ...... guns
* 6 × FIM-92 Stinger SAMs
Ship badge
Ship complement
* 4 officers
* 24 enlisted
* 8 special forces
Ship country
Ship decommissioned
Ship displacement
* 341 long tons full load
* 372 long tons full load
Ship in service
Ship propulsion
*4 × Paxman marine Diesel engines
* 14,400 bhp total
* 4 × shafts
Ship sensors
Sperry Vision 2100M integrated navigation/combat system
subject
comment
USS Cyclone (PC-1) was the fir ...... commissioned on 7 August 1993.
@en
label
USS Cyclone
@en
wasDerivedFrom
isPrimaryTopicOf
name
BRP Mariano Alvarez (PS-38)
@en
Cyclone
@en
USCGC Cyclone (WPC 1)
@en