Alto Valle thermal power plant
The Alto Valle Thermal Central is a thermal power station located in the city of Neuquén, Argentina (northwestern Patagonia, Comahue region). It employs natural gas and has an installed capacity of 97 MW. Its output is highly variable, depending on the electric market conditions. The power station was started on 24 February 1969. The combined cycles were installed in 1995. Duke Energy, which also owns the Cerros Colorados Hydroelectric Complex, was granted the exploitation concession in 2000.
Wikipage redirect
Link from a Wikipage to another Wikipage
primaryTopic
Alto Valle thermal power plant
The Alto Valle Thermal Central is a thermal power station located in the city of Neuquén, Argentina (northwestern Patagonia, Comahue region). It employs natural gas and has an installed capacity of 97 MW. Its output is highly variable, depending on the electric market conditions. The power station was started on 24 February 1969. The combined cycles were installed in 1995. Duke Energy, which also owns the Cerros Colorados Hydroelectric Complex, was granted the exploitation concession in 2000.
has abstract
The Alto Valle Thermal Central ...... ploitation concession in 2000.
@en
Link from a Wikipage to an external page
Wikipage page ID
page length (characters) of wiki page
Wikipage revision ID
933,320,118
Link from a Wikipage to another Wikipage
wikiPageUsesTemplate
subject
hypernym
type
comment
The Alto Valle Thermal Central ...... ploitation concession in 2000.
@en
label
Alto Valle thermal power plant
@en