Berlin outer ring

The Berlin outer ring (German: Berliner Außenring, BAR) is a 125 km (78 mi) long double track electrified railway, originally built by the German Democratic Republic to bypass West Berlin in preparation for the building of the Berlin Wall during the division of Germany. It was developed by East Germany for economic, transport policy, and military reasons between 1951 and 1961 and included parts of some older lines (Outer Freight Ring, Jüterbog–Nauen railway, and Michendorf–Großbeeren railway). The term Outer ring is used to distinguish the line from the Ring line of inner Berlin.

Berlin outer ring

The Berlin outer ring (German: Berliner Außenring, BAR) is a 125 km (78 mi) long double track electrified railway, originally built by the German Democratic Republic to bypass West Berlin in preparation for the building of the Berlin Wall during the division of Germany. It was developed by East Germany for economic, transport policy, and military reasons between 1951 and 1961 and included parts of some older lines (Outer Freight Ring, Jüterbog–Nauen railway, and Michendorf–Großbeeren railway). The term Outer ring is used to distinguish the line from the Ring line of inner Berlin.