Bozyaka (İzmir Metro)
Bozyaka is a proposed underground station on the Üçyol—Çamlıkule Line of the İzmir Metro. It will be located beneath Ali Rıza Avni Boulevard in northern Karabağlar. Construction of the station, along with the metro line, is expected to begin in 2020. The station will be constructed on the southern part of a loop, that will split west of General Asım Gündüz station and connect at Üçyol. Zafertepe station will be the counterpart to Bozyaka, on the northern section of the loop. Zafertepe station is expected to open in 2024.
Link from a Wikipage to another Wikipage
primaryTopic
Bozyaka (İzmir Metro)
Bozyaka is a proposed underground station on the Üçyol—Çamlıkule Line of the İzmir Metro. It will be located beneath Ali Rıza Avni Boulevard in northern Karabağlar. Construction of the station, along with the metro line, is expected to begin in 2020. The station will be constructed on the southern part of a loop, that will split west of General Asım Gündüz station and connect at Üçyol. Zafertepe station will be the counterpart to Bozyaka, on the northern section of the loop. Zafertepe station is expected to open in 2024.
has abstract
Bozyaka is a proposed undergro ...... n is expected to open in 2024.
@en
address
Ali Rıza Avni Blv., Zafertepe Mah., 35110
@en
number of tracks
opening year
owner
owning organisation
type
Wikipage page ID
56,132,804
page length (characters) of wiki page
Wikipage revision ID
968,367,162
Link from a Wikipage to another Wikipage
address
Ali Rıza Avni Blv., Zafertepe Mah., 35110
@en
disabled
Yes
@en
name
Bozyaka
@en
operator
owned
style
İBB
@en
type
İzmir Metro rapid transit station
@en
wikiPageUsesTemplate
point
38.399045 27.123653
comment
Bozyaka is a proposed undergro ...... n is expected to open in 2024.
@en
label
Bozyaka (İzmir Metro)
@en
sameAs
lat
3.8399045e+1
long
2.7123653e+1
wasDerivedFrom
isPrimaryTopicOf
name
Bozyaka
@en