Charlotte and South Carolina Railroad
The Charlotte and South Carolina Railroad began in 1852 and operated until 1869, when it was absorbed by Charlotte, Columbia and Augusta Railroad. The line ran between Charlotte, North Carolina and Columbia, South Carolina. It was the first carrier to serve Mecklenburg County, North Carolina. The railroad was 110 miles (180 km) long and its track gauge was 5 ft (1,524 mm).
Air Line Railroad in South CarolinaCharlotte, Columbia and Augusta RailroadColumbia and Augusta RailroadGreenwood_County,_South_CarolinaList of North Carolina railroadsList of South Carolina railroadsList of railroads of the Confederate States of AmericaRock_Hill,_South_CarolinaYork_County,_South_Carolina
Link from a Wikipage to another Wikipage
primaryTopic
Charlotte and South Carolina Railroad
The Charlotte and South Carolina Railroad began in 1852 and operated until 1869, when it was absorbed by Charlotte, Columbia and Augusta Railroad. The line ran between Charlotte, North Carolina and Columbia, South Carolina. It was the first carrier to serve Mecklenburg County, North Carolina. The railroad was 110 miles (180 km) long and its track gauge was 5 ft (1,524 mm).
has abstract
The Charlotte and South Caroli ...... ack gauge was 5 ft (1,524 mm).
@en
closing year
opening year
Link from a Wikipage to an external page
Wikipage page ID
30,064,308
page length (characters) of wiki page
Wikipage revision ID
1,006,260,184
Link from a Wikipage to another Wikipage
end year
railroad name
Charlotte and South Carolina Railroad
@en
start year
successor line
wikiPageUsesTemplate
subject
comment
The Charlotte and South Caroli ...... ack gauge was 5 ft (1,524 mm).
@en
label
Charlotte and South Carolina Railroad
@en
isPrimaryTopicOf
name
Charlotte and South Carolina Railroad
@en