Condor Cliff Dam
The Condor Cliff Dam, formerly known as Néstor Kirchner Dam, is a concrete-face rock-fill dam being built on the Santa Cruz River about 180 km (110 mi) west of Puerto Santa Cruz in Santa Cruz Province, Argentina. It was renamed after the former president Néstor Kirchner, born in Santa Cruz. A consortium led by China's Gezhouba Group was awarded the contract to build the Néstor Kirchner Dam and Jorge Cepernic Dam downstream in August 2013. The consortium will also fund the construction. Both dams are expected to cost nearly US$4.8 billion. It will be built by the firm Electroingeniería, led by Osvaldo Acosta and Gerardo Ferreyra. The primary purpose of the dam is hydroelectric power generation and its power station will have an installed capacity of 1,140 megawatts (1,530,000 hp).
Wikipage disambiguates
Link from a Wikipage to another Wikipage
primaryTopic
Condor Cliff Dam
The Condor Cliff Dam, formerly known as Néstor Kirchner Dam, is a concrete-face rock-fill dam being built on the Santa Cruz River about 180 km (110 mi) west of Puerto Santa Cruz in Santa Cruz Province, Argentina. It was renamed after the former president Néstor Kirchner, born in Santa Cruz. A consortium led by China's Gezhouba Group was awarded the contract to build the Néstor Kirchner Dam and Jorge Cepernic Dam downstream in August 2013. The consortium will also fund the construction. Both dams are expected to cost nearly US$4.8 billion. It will be built by the firm Electroingeniería, led by Osvaldo Acosta and Gerardo Ferreyra. The primary purpose of the dam is hydroelectric power generation and its power station will have an installed capacity of 1,140 megawatts (1,530,000 hp).
length (km)
has abstract
Přehrada Néstora Kirchnera je ...... , která má být níže po proudu.
@cs
The Condor Cliff Dam, formerly ...... the construction of the dams.
@en
ГЕС Кондор-Кліфф (ісп. Cóndor ...... роекту очікується у 2022 році.
@uk
building start date
building start year
description
Embankment, concrete-face rock-fill
@en
height (μ)
vastest lake
length (μ)
purpose
volume (μ³)
Wikipage page ID
42,604,608
page length (characters) of wiki page
Wikipage revision ID
934,458,606
Link from a Wikipage to another Wikipage
construction began
July 2015
@en
country
Argentina
@en
dam crosses
dam type
Embankment, concrete-face rock-fill
@en
location map
Argentina
@en
name
Néstor Kirchner Dam
@en
plant turbines
purpose
Power
@en
status
UC
@en
wikiPageUsesTemplate
subject
point
-50.211575 -70.77508055555556
comment
Přehrada Néstora Kirchnera je ...... est miliard metrů krychlových.
@cs
The Condor Cliff Dam, formerly ...... ,140 megawatts (1,530,000 hp).
@en
ГЕС Кондор-Кліфф (ісп. Cóndor ...... роекту очікується у 2022 році.
@uk
label
Condor Cliff Dam
@en
Přehrada Néstora Kirchnera
@cs
ГЕС Кондор-Кліфф
@uk
lat
-5.0211575e+1
long
-7.077508055555556e+1
wasDerivedFrom
isPrimaryTopicOf
name
Néstor Kirchner Dam
@en