Constantine tramway

The Constantine Tramway is a tram way system which has been operating in Constantine, Algeria, Algeria, since 2013. There have been several delays and cost over-runs in the construction of the tramway. Originally scheduled to enter revenue service in November 2011, the first section of 8.9 kilometres with 10 stations between the Ben-Abdelmalek-Ramdhan stadium and Zouaghi opened on 4 July 2013 and includes 5 additional stations as of 2019.

Constantine tramway

The Constantine Tramway is a tram way system which has been operating in Constantine, Algeria, Algeria, since 2013. There have been several delays and cost over-runs in the construction of the tramway. Originally scheduled to enter revenue service in November 2011, the first section of 8.9 kilometres with 10 stations between the Ben-Abdelmalek-Ramdhan stadium and Zouaghi opened on 4 July 2013 and includes 5 additional stations as of 2019.