Dokie Ridge Wind Farm
The Dokie Ridge Wind Farm is a wind farm located near Chetwynd, British Columbia, Canada (about 1,100 km northeast of Vancouver). It was put into commercial operation in 2011. The facility has a generating capacity of 144 megawatts and is produces 320 to 340 gigawatt-hours of energy per year. .Electrical engineering consulting services are provided by BC Hydro announced the project was in commercial operation as of February 16, 2011. The project was built in partnership between GE and Plutonic Power Corporation (now Alterra Power Corp.). The wind farm has 48 Vestas V90 3 MW turbines, an electrical substation and seven kilometers of transmission line. The project cost about $228 million (Canadian).
primaryTopic
Dokie Ridge Wind Farm
The Dokie Ridge Wind Farm is a wind farm located near Chetwynd, British Columbia, Canada (about 1,100 km northeast of Vancouver). It was put into commercial operation in 2011. The facility has a generating capacity of 144 megawatts and is produces 320 to 340 gigawatt-hours of energy per year. .Electrical engineering consulting services are provided by BC Hydro announced the project was in commercial operation as of February 16, 2011. The project was built in partnership between GE and Plutonic Power Corporation (now Alterra Power Corp.). The wind farm has 48 Vestas V90 3 MW turbines, an electrical substation and seven kilometers of transmission line. The project cost about $228 million (Canadian).
has abstract
The Dokie Ridge Wind Farm is a ...... about $228 million (Canadian).
@en
Wikipage page ID
25,567,772
page length (characters) of wiki page
Wikipage revision ID
911,934,527
Link from a Wikipage to another Wikipage
wikiPageUsesTemplate
hypernym
point
55.8031 -122.2658
comment
The Dokie Ridge Wind Farm is a ...... about $228 million (Canadian).
@en
label
Dokie Ridge Wind Farm
@en
lat
5.58031e+1
long
-1.222658e+2