Expressway S7 (Poland)

Expressway S7 or express road S7 (in Polish Droga ekspresowa S7) is a major road in Poland which has been planned to run from Gdańsk on the Baltic coast through Elbląg, Warsaw, Radom, Kielce and Kraków to Rabka near the border with Slovakia. On almost the entire route, the S7 will be built by upgrading the existing National Road 7 (DK 7). Its total planned length is 720 km (450 mi), of which 457.8 km (284.5 mi) has been built and a further 145.9 km (90.7 mi) is under construction in December 2019. The upgrade is part of a European plan to fund 330 kilometers of new express roads in Poland.

Expressway S7 (Poland)

Expressway S7 or express road S7 (in Polish Droga ekspresowa S7) is a major road in Poland which has been planned to run from Gdańsk on the Baltic coast through Elbląg, Warsaw, Radom, Kielce and Kraków to Rabka near the border with Slovakia. On almost the entire route, the S7 will be built by upgrading the existing National Road 7 (DK 7). Its total planned length is 720 km (450 mi), of which 457.8 km (284.5 mi) has been built and a further 145.9 km (90.7 mi) is under construction in December 2019. The upgrade is part of a European plan to fund 330 kilometers of new express roads in Poland.