Grayling Bicycle Turnpike
The Grayling Bicycle Turnpike is a multiple-use, non-motorized paved trailway in Michigan, about 6.5 miles (10.5 km) long. It begins at the entrance to Hartwick Pines State Park and runs southerly along M-93, eventually meeting Business Loop Interstate 75 (BL I-75) and ending at East Michigan Avenue. The turnpike is used for a stretch of the Avita Water Black Bear Bicycle Tour, which coincides with the Weyerhauser Au Sable River Canoe Marathon and shadows the route of the canoes over the roadways, beginning in Grayling and ending in Oscoda.
* v
* t
* e
* v
* t
* e
Link from a Wikipage to another Wikipage
primaryTopic
Grayling Bicycle Turnpike
The Grayling Bicycle Turnpike is a multiple-use, non-motorized paved trailway in Michigan, about 6.5 miles (10.5 km) long. It begins at the entrance to Hartwick Pines State Park and runs southerly along M-93, eventually meeting Business Loop Interstate 75 (BL I-75) and ending at East Michigan Avenue. The turnpike is used for a stretch of the Avita Water Black Bear Bicycle Tour, which coincides with the Weyerhauser Au Sable River Canoe Marathon and shadows the route of the canoes over the roadways, beginning in Grayling and ending in Oscoda.
* v
* t
* e
* v
* t
* e
has abstract
The Grayling Bicycle Turnpike ......
* v
* t
* e
* v
* t
* e
@en
Wikipage page ID
19,508,807
page length (characters) of wiki page
Wikipage revision ID
1,001,687,784
Link from a Wikipage to another Wikipage
difficulty
Moderate
@en
hazards
Road Crossings, Highway Overpasses, Steep Grade Hills with Sweeping Curves
@en
length mi
Location
name
Grayling Bicycle Turnpike
@en
season
Year Round
@en
trailheads
Michigan Ave.
@en
wikiPageUsesTemplate
subject
point
44.7098 -84.70997
type
comment
The Grayling Bicycle Turnpike ......
* v
* t
* e
* v
* t
* e
@en
label
Grayling Bicycle Turnpike
@en
lat
4.47098e+1
long
-8.470997e+1