Jindo–Jeju HVDC system
The Jindo–Jeju HVDC system is a 105 km HVDC submarine cable connection in South Korea between the island of Jindo, close to the Korean Peninsula, and the more distant island of Jeju. The system has a capacity of 400 MW and transmission voltage of ±250 kV and was put into service in 2014. It is the second HVDC link to Jeju Island, after the Haenam–Cheju link completed in the late 1990s (the spelling of the island’s name was changed from Cheju to Jeju in 2000). The converter stations use Line-Commutated Converters with a conventional arrangement of a single Twelve-pulse bridge per pole.
Wikipage redirect
Link from a Wikipage to another Wikipage
primaryTopic
Jindo–Jeju HVDC system
The Jindo–Jeju HVDC system is a 105 km HVDC submarine cable connection in South Korea between the island of Jindo, close to the Korean Peninsula, and the more distant island of Jeju. The system has a capacity of 400 MW and transmission voltage of ±250 kV and was put into service in 2014. It is the second HVDC link to Jeju Island, after the Haenam–Cheju link completed in the late 1990s (the spelling of the island’s name was changed from Cheju to Jeju in 2000). The converter stations use Line-Commutated Converters with a conventional arrangement of a single Twelve-pulse bridge per pole.
has abstract
The Jindo–Jeju HVDC system is ...... Twelve-pulse bridge per pole.
@en
Wikipage page ID
48,589,334
page length (characters) of wiki page
Wikipage revision ID
961,834,080
Link from a Wikipage to another Wikipage
cable manufacturer
capacity
country
current type
DC voltage
±250 kV
@en
finish
length km
map caption
Location of Jindo–Jeju HVDC system
@en
name
Jindo–Jeju HVDC system
@en
start
substation manufacturer
Alstom Grid
@en
type
Transmission
@en
wikiPageUsesTemplate
hypernym
point
34.385555555555555 126.47333333333333
type
comment
The Jindo–Jeju HVDC system is ...... Twelve-pulse bridge per pole.
@en
label
Jindo–Jeju HVDC system
@en
sameAs
lat
3.4385555555555554e+1
long
1.2647333333333333e+2