K13 Harpe Bru Bridge

K13 Harpe Bru Bridge is the first extradosed cable-stayed bridge in Norway. Technical information: * Extradosed Stay Cable Bridge (Length 320m) * spans 45+65+100+65+45m * foundations – piles/flat (founded on rock) * pylons height 16,0m Owner: * Statens Vegvesen Design: * Johs Holt AS Checking engineering: * COWI AS Contractor: * Implenia Construction SA Completion: October 2015

K13 Harpe Bru Bridge

K13 Harpe Bru Bridge is the first extradosed cable-stayed bridge in Norway. Technical information: * Extradosed Stay Cable Bridge (Length 320m) * spans 45+65+100+65+45m * foundations – piles/flat (founded on rock) * pylons height 16,0m Owner: * Statens Vegvesen Design: * Johs Holt AS Checking engineering: * COWI AS Contractor: * Implenia Construction SA Completion: October 2015