Kolkata Bus Rapid Transit System
Kolkata BRTS is a bus rapid transit system taken up by KMDA. Beginning at Ultadanga, the route will cover 15.5 km running along the E M Bypass to Garia. The corridor connects major growth centres like Ultadanga, Salt Lake, Tangra Metropolitan, Anandapur, Mukundapur and Patuli township. The project is under construction, and expected to be completed by 2013. Till date (July 2014) not much work has been done. It is not expected to be over before 2018. Like typical government projects - its status is not made public.
Wikipage redirect
Link from a Wikipage to another Wikipage
primaryTopic
Kolkata Bus Rapid Transit System
Kolkata BRTS is a bus rapid transit system taken up by KMDA. Beginning at Ultadanga, the route will cover 15.5 km running along the E M Bypass to Garia. The corridor connects major growth centres like Ultadanga, Salt Lake, Tangra Metropolitan, Anandapur, Mukundapur and Patuli township. The project is under construction, and expected to be completed by 2013. Till date (July 2014) not much work has been done. It is not expected to be over before 2018. Like typical government projects - its status is not made public.
has abstract
Kolkata BRTS is a bus rapid tr ...... its status is not made public.
@en
location
number of lines
Wikipage page ID
32,008,298
page length (characters) of wiki page
Wikipage revision ID
996,554,707
Link from a Wikipage to another Wikipage
caption
Kolkata BRTS route
@en
imagesize
locale
map state
collapsed
@en
name
Kolkata BRTS
@en
transit type
wikiPageUsesTemplate
comment
Kolkata BRTS is a bus rapid tr ...... its status is not made public.
@en
label
Kolkata Bus Rapid Transit System
@en
wasDerivedFrom
isPrimaryTopicOf
name
@en
Kolkata BRTS
@en