Lauingen Energy Park

The Lauingen Energy Park is a 25.7–megawatt (MW) photovoltaic power station, located in Bavarian Swabia, Germany. It covers an area of 63 hectares (155.7 acres) and was commissioned in June 2010. The project was built in three phases: * The 10.0 MW Helmeringen 1 (already commissioned in 2009) * The 9.4 MW Helmeringen 2 * The 6.3 MW Helmeringen 3 (built and commissioned in 2010) The largest solar power station in Swabia was built by the German company Gehrlicher Solar and features the following key figures:

Lauingen Energy Park

The Lauingen Energy Park is a 25.7–megawatt (MW) photovoltaic power station, located in Bavarian Swabia, Germany. It covers an area of 63 hectares (155.7 acres) and was commissioned in June 2010. The project was built in three phases: * The 10.0 MW Helmeringen 1 (already commissioned in 2009) * The 9.4 MW Helmeringen 2 * The 6.3 MW Helmeringen 3 (built and commissioned in 2010) The largest solar power station in Swabia was built by the German company Gehrlicher Solar and features the following key figures: