Leipzig-Plagwitz–Leipzig Miltitzer Allee railway

The Leipzig-Plagwitz–Leipzig Miltitzer Allee railway is a two-track electrified main-line in the German state of Saxony. It runs from Leipzig-Plagwitz to Leipzig-Grünau and is integrated into the network of the S-Bahn Mitteldeutschland. However, there were no services on the line from the end of April 2011 until 14 December 2013 due to a reduction in funding for public transport.

Leipzig-Plagwitz–Leipzig Miltitzer Allee railway

The Leipzig-Plagwitz–Leipzig Miltitzer Allee railway is a two-track electrified main-line in the German state of Saxony. It runs from Leipzig-Plagwitz to Leipzig-Grünau and is integrated into the network of the S-Bahn Mitteldeutschland. However, there were no services on the line from the end of April 2011 until 14 December 2013 due to a reduction in funding for public transport.