Line 3 (Rio LRT)

Line 3: Central ↔ Santos Dumont is a LRT line on VLT Carioca system, located in Rio de Janeiro, Brazil. It has 10 stops, all at-grade, 6 of them connected with Line 1 (including terminal station Santos Dumont), 1 with Line 2 (terminal station Central), and 3 more for Line 3: Santa Rita/Pretos Novos, Camerino/Rosas Negras and Cristiano Ottoni/Pequena África. The line is in tests since November 2018, but problems between Rio's Prefecture and the LRT operating consortium didn't allow the line to enter in operation. It was opened on 26 October 2019.`

Line 3 (Rio LRT)

Line 3: Central ↔ Santos Dumont is a LRT line on VLT Carioca system, located in Rio de Janeiro, Brazil. It has 10 stops, all at-grade, 6 of them connected with Line 1 (including terminal station Santos Dumont), 1 with Line 2 (terminal station Central), and 3 more for Line 3: Santa Rita/Pretos Novos, Camerino/Rosas Negras and Cristiano Ottoni/Pequena África. The line is in tests since November 2018, but problems between Rio's Prefecture and the LRT operating consortium didn't allow the line to enter in operation. It was opened on 26 October 2019.`