Line 7 (Suzhou Rail Transit)
Line 7 of Suzhou Rail Transit is an under construction rapid transit line in Suzhou. Construction started on December 25, 2019. The line will be 29.6 kilometers long. According to the plans, the part of Line 4 between Hongzhuang and Muli stations will be operated as Line 7. It has Tian'edang Parking area (Chinese: 天鹅荡停车场) in the line.
Wikipage disambiguates
Wikipage redirect
Link from a Wikipage to another Wikipage
primaryTopic
Line 7 (Suzhou Rail Transit)
Line 7 of Suzhou Rail Transit is an under construction rapid transit line in Suzhou. Construction started on December 25, 2019. The line will be 29.6 kilometers long. According to the plans, the part of Line 4 between Hongzhuang and Muli stations will be operated as Line 7. It has Tian'edang Parking area (Chinese: 天鹅荡停车场) in the line.
has abstract
Line 7 of Suzhou Rail Transit ...... (Chinese: 天鹅荡停车场) in the line.
@en
is part of
line length (μ)
number of stations
route end
route start
status
Under construction (one segment is operational)
type
Wikipage page ID
36,183,343
page length (characters) of wiki page
Wikipage revision ID
1,006,441,948
Link from a Wikipage to another Wikipage
end
image width
linelength
map state
collapsed
@en
operator
Suzhou Rail Transit Co., Ltd
@en
owner
Suzhou Rail Transit Co., Ltd
@en
start
stations
status
Under construction
@en
system
type
wikiPageUsesTemplate
subject
type
comment
Line 7 of Suzhou Rail Transit ...... (Chinese: 天鹅荡停车场) in the line.
@en
label
Line 7 (Suzhou Rail Transit)
@en